A £19 million opportunity exists at UK service stations. Most operators haven’t noticed.

I examined RenEnergy’s latest research on solar carports, and the numbers are clear. The UK has 151 service stations with 46,153 parking spaces suitable for solar panel installations. If converted, these locations could generate 124GWh of energy annually.

That’s enough to power 1.9 million electric vehicle trips from London to Manchester.

The business case writes itself.

While the UK struggles to expand EV charging infrastructure, service stations could generate power on-site and eliminate dependency on strained grid connections. The country currently has only 5,894 rapid charging points, far short of the 35,000 needed by 2030.

Compare that to France.

France’s 2022 legislation requires all car parks with 80 or more spaces to install solar panels. The policy is expected to unlock 11GW of capacity, essentially doubling the country’s existing solar infrastructure. Carrefour alone is installing 350 solar carports that will produce 450GWh annually.

The UK actually has an advantage France doesn’t. Solar carports can receive approval within eight weeks under permitted development, while ground-mounted solar arrays face lengthy planning processes. That’s fast.

The technology isn’t theoretical. Bentley Motors installed a solar carport at its Crewe headquarters in 2019. The installation covers 16,426m² with 10,000 solar panels generating 2.7MW of capacity.

It works. The infrastructure exists. The approval process is streamlined.

So why aren’t service stations moving?

The barrier isn’t technical. It’s inertia. Most operators view their business as fuel and convenience retail, not energy generation. That perspective is expensive.

Rather than selling energy back to the grid, operators could power EV charging stations on-site. This reduces infrastructure costs and bypasses grid connection delays that currently slow charging network expansion.

RenEnergy’s broader research shows UK business parking spaces could generate 1.57GW through carport installations. Service stations represent a focused subset of this potential, concentrated along major transportation routes where charging demand is highest.

Service station operators who move first will control their energy costs, attract EV drivers, and reduce grid dependency. Those who wait will pay premium rates for grid power while watching traffic shift to competitors with charging infrastructure.

The £19 million opportunity won’t wait. Neither will EV drivers looking for fast charging on major routes.